Port 10 Logistics Center
Baytown · Houston metro
Port 10 Logistics Center
- Size
- 412,000 SF
- Contract
- $28.4M
- Delivery
- Design-Build
General contractor — Houston, TX · Est. 1997
Ironvale plans, prices, and delivers commercial, industrial, and custom residential work across Houston, Dallas–Fort Worth, Austin, and San Antonio — $840M of it since 1997.
Division 01
Ground-up shells, tilt-wall, design-build, and tenant finish-out for developers and owners who track schedule in days, not seasons.
Explore commercial
Division 02
Architect-led homes and whole-home remodels held to commercial tolerances — submittals, three-week look-aheads, and a superintendent on site.
Explore residentialCapabilities
Concrete and structure with our own crews. Everything else through a vetted bench of Texas trade partners — 380 subcontractors prequalified and rated on the last job, not the first meeting.
Site to shell to certificate of occupancy — retail, office, flex, and institutional from 10,000 to 500,000 SF.
Self-performed forming, casting, and panel crews. 1.2M SF of tilt-wall lifted in Harris County since 2019.
One contract, early numbers. Average GMP-to-closeout variance of 2.1% across the last 40 negotiated projects.
Occupied-campus and shell-space interiors delivered in as few as nine weeks, permits included.
Pipe racks, process pads, pre-engineered metal buildings, and heavy foundations for Gulf Coast operators.
Architect-led homes and remodels from $750K to $12M, managed with commercial controls and reporting.
Featured work
Three from the last 24 months. Square footage, contract value, and delivery method on every one — that is the record that matters.
Baytown · Houston metro
Austin
Austin
Safety record
0.68Experience modification rate
An EMR of 0.68 puts Ironvale in the top decile of Texas general contractors — and 1.4 million consecutive man-hours without a lost-time incident backs it up.
Daily pre-task plans on every crew. OSHA 30 for every superintendent. Stop-work authority for every worker on site, ours or a trade partner's.
Our safety programLicensing · insurance · bonding
Process
The same four-phase sequence on a $500K finish-out or a $40M shell. No surprises is a deliverable.
Budget validation from schematic drawings, constructability review, and early trade pricing — typically inside 10 business days.
GMP or hard-bid contract with a resource-loaded baseline schedule. Our last 40 negotiated jobs closed within 2.1% of the number.
Weekly OAC meetings, three-week look-ahead schedules, and cost reports the owner sees the same day we do.
As-builts, attic stock, and O&M manuals at substantial completion — then an 11-month warranty walk before your coverage year ends.
Client record
"Ironvale turned our permit set into a delivered shell in 41 weeks — two ahead of baseline. Their superintendent ran the tightest site I've walked in fifteen years of development."
"They finished out 68,000 SF of clinical space on an occupied campus without one interruption to patient care. Scheduling around our hours cost them nights; it never cost us a complaint."
"We interviewed five builders for our home. Ironvale was the only one that showed up with a schedule, a cost model, and references we could actually call. Eleven months later, they beat all three."
Who we build for
Service area
Six Texas metros, one standard. Field leadership lives in the markets they run.
Outside these metros? For the right scope, we travel — ask us.
Next step
Send what you have. A senior estimator returns a real number within one business day.